Homes & businesses with reliable grid power

On-Grid Solar

Net-metered systems that slash your KSEB bill to near zero.

On-grid systems are the most popular choice for Kerala homes with reliable grid power. Excess solar generation is exported back to KSEB through net metering, and you only pay for the net units consumed. Lowest upfront cost, fastest payback, and eligible for central government subsidy.

Payback 4–5 yearsSubsidy YesBattery No
What you get

Features included

  • Net metering with KSEB
  • PM Surya Ghar subsidy up to ₹78,000
  • Lowest cost per kW
  • Zero maintenance batteries
  • 25-year panel warranty
Components

What's inside the system

Mono PERC Panels

Tier-1 modules, 540W+ each

String Inverter

Growatt / Solis / Sungrow

Mounting Structure

GI rooftop mounting frame

AC/DC Protection

Surge & fault protection units

Pricing

Indicative system sizes

Indicative ranges before PM Surya Ghar subsidy. Exact quote after a free site survey.

1 kW
Estimated cost
₹55,000 – ₹65,000
Payback 4–5 yrs

Studio / 1BHK · monthly bill < ₹1,500

3 kW
Estimated cost
₹1.8 – ₹2.0 lakh
Payback 4–5 yrs

2–3BHK home · monthly bill ₹2,500 – ₹5,000

5 kW
Estimated cost
₹3.0 – ₹3.3 lakh
Payback 5–6 yrs

Large home with ACs · bill ₹6,000+

FAQ

Questions about on-grid solar

A typical on-grid system costs around ₹55,000–₹65,000 per kW installed, before the PM Surya Ghar subsidy. A 3 kW system runs approximately ₹1.8 lakh, with up to ₹78,000 returned as central subsidy — net cost roughly ₹1 lakh.

Yes, if you are a residential KSEB consumer installing an on-grid or hybrid system between 1 kW and 10 kW. We handle the entire portal application, inspection, and disbursal paperwork at no extra cost.

Site survey takes 1 day. Installation takes 2–4 days depending on system size. KSEB net metering paperwork and inspection adds 2–4 weeks. From signed agreement to active net meter typically 4–6 weeks total.

Net metering lets you export surplus solar generation back to the KSEB grid. Your meter runs backwards when exporting. At month-end you pay only for the net (imported minus exported) units. Excess credits carry over.

Free site survey · No obligation

Ready to put your roof to work?