Remote sites, farms, areas with poor grid

Off-Grid Solar

Fully independent power, even when the grid is down.

Off-grid systems generate, store, and use solar power without any grid connection. Ideal for remote farms, holiday homes, and locations where KSEB connection is unreliable or unavailable. Larger battery banks deliver true energy independence.

Payback 6–8 yearsSubsidy NoBattery Yes
What you get

Features included

  • True energy independence
  • Lithium-ion battery storage
  • Runs critical loads 24/7
  • No grid dependency
  • Expandable battery bank
Components

What's inside the system

Mono PERC Panels

Tier-1 modules, 540W+ each

Hybrid Inverter

Off-grid capable, MPPT controller

Lithium Battery

48V LiFePO4, 10-year warranty

Mounting Structure

GI rooftop / ground-mount frame

Pricing

Indicative system sizes

Indicative ranges before PM Surya Ghar subsidy. Exact quote after a free site survey.

1 kW
Estimated cost
₹55,000 – ₹65,000
Payback 4–5 yrs

Studio / 1BHK · monthly bill < ₹1,500

3 kW
Estimated cost
₹1.8 – ₹2.0 lakh
Payback 4–5 yrs

2–3BHK home · monthly bill ₹2,500 – ₹5,000

5 kW
Estimated cost
₹3.0 – ₹3.3 lakh
Payback 5–6 yrs

Large home with ACs · bill ₹6,000+

FAQ

Questions about off-grid solar

A typical on-grid system costs around ₹55,000–₹65,000 per kW installed, before the PM Surya Ghar subsidy. A 3 kW system runs approximately ₹1.8 lakh, with up to ₹78,000 returned as central subsidy — net cost roughly ₹1 lakh.

Yes, if you are a residential KSEB consumer installing an on-grid or hybrid system between 1 kW and 10 kW. We handle the entire portal application, inspection, and disbursal paperwork at no extra cost.

Site survey takes 1 day. Installation takes 2–4 days depending on system size. KSEB net metering paperwork and inspection adds 2–4 weeks. From signed agreement to active net meter typically 4–6 weeks total.

Net metering lets you export surplus solar generation back to the KSEB grid. Your meter runs backwards when exporting. At month-end you pay only for the net (imported minus exported) units. Excess credits carry over.

Free site survey · No obligation

Ready to put your roof to work?